AMOR ENERGY | SELECTED EXPERIENCE

Infrastructure built
to perform.

Amor Group's Canadian operating company brings disciplined project controls, electrical depth and field execution to complex live-site projects across Western Canada.

MunicipalCommercialFleetMURBElectrical infrastructure
500+Projects completed
1,000+Level 2 stalls energized
50+DC fast chargers installed
15+Cities served · BC to Manitoba

Real installations. Real operating environments.

Selected Amor project photography from multi-residential, commercial fleet and municipal infrastructure work.

FLO chargers installed by Amor Energy throughout the Rogers Tower parkade in Vancouver
ROGERS TOWER50-charger Phase 1 deployment
DC fast chargers installed by Amor Energy at IKEA Calgary
IKEA WESTERN CANADACommercial fleet fast charging
Maple Ridge fleet vehicles charging beside the completed 18-port municipal installation
CITY OF MAPLE RIDGE18-port municipal fleet installation

Turnkey delivery includes what happens below grade.

Amor coordinates excavation, trenching, conduits, reinforcing, concrete, equipment placement, transformers and electrical distribution—then tests and commissions the completed system.

Municipal charging infrastructure—built for daily operations.

A complete 18-port Level 2 installation with ten dual-port pedestals, an outdoor electrical kiosk, civil and electrical work, networking, testing and commissioning.

Municipal fleet charging across two operating locations.

Amor delivered the electrical distribution—including transformers—civil work and 24 Level 2 chargers across two municipal locations.

Experience that connects design intent to field reality.

The role stated for each project is deliberate. Delivered construction, installation and commissioning are separated from advisory or pre-construction participation.

Multi-residential / Commercial

Rogers Tower — Downtown Vancouver

EV-ready backbone for 300 stalls across five parkade levels, six transformers and main-distribution rework. Phase 1 was completed with 50 FLO chargers.

Commercial / Fleet

IKEA Western Canada

Fleet charging deployments across Richmond, Calgary, Edmonton and Winnipeg, including 20 DC fast chargers, electrical and civil work, networking and utility coordination.

Municipal / Fleet

City of Maple Ridge — Operations Centre

Prime electrical contractor for 18 Level 2 charging ports, ten dual-port pedestals and a new outdoor kiosk, including civil and electrical work, networking, testing and commissioning.

Municipal

Township of Langley RCMP

Ten Level 2 chargers with civil trenching, panel upgrades, kiosk installation and BC Hydro coordination.

Commercial portfolio

MetroTower Group

Installed more than 50 EV chargers across eight properties in the Lower Mainland.

Municipal / Fleet

Sunshine Coast — Two municipal locations

Electrical distribution upgrades, transformers and civil work supporting a total of 24 Level 2 chargers across two locations.

Advisory / Pre-construction

City of Coquitlam — Austin Works Yard

Initial design and constructability consultation with BoBi Engineering. Amor did not deliver the construction scope.

Start a conversation

Planning a complex electrical project?

Let’s define the scope, constraints and path to energization.