AI INFRASTRUCTURE | PHASED DEVELOPMENT

Start at 1–3 MW.
Prove the model. Scale the site.

AMOR's preferred initial development model targets approximately 1–3 MW of AI compute capacity, allowing technical performance and commercial demand to be proven before larger-scale capital deployment.

Why start with a 1–3 MW AI pilot?

AMOR uses an initial 1–3 MW IT capacity block to limit early capital exposure and validate infrastructure, operating performance and customer demand before a larger commitment. Modular development means adding coordinated capacity blocks; it does not imply a universal container size, rack count or site footprint.

011–3 MW

Initial pilot

A defined first capacity block

02Phased

Capital exposure

Commit only at approved gates

03Prove

Infrastructure

Electrical · cooling · network

04Validate

Demand

Customer / offtake before scale

What does a 1–3 MW AI pilot site need?

Use this as an initial screening framework—not a finished design. The target is AI IT load; utility capacity, external connectivity, cooling and physical infrastructure must support the complete facility.

1 MW AI IT LOAD1.2–1.4 MW

illustrative operating facility demand · initial usable-power screen ≈ 1.5 MW

3 MW AI IT LOAD3.6–4.2 MW

illustrative operating facility demand · initial usable-power screen ≈ 4.5 MW

DEFINITION1 MW / 3 MW = target AI IT / compute load

These figures do not represent total utility or facility demand.

AI IT PILOT1 MWILLUSTRATIVE INITIAL PLANNING
Target AI IT / compute load1.0 MWDefined pilot capacity
Operating facility demand1.2–1.4 MWIllustrative planning range
Initial usable-power screen≈ 1.5 MWBefore detailed design
FIBRE / CONNECTIVITYExternal carrier / WAN readiness

Two physically diverse fibre paths preferred, with scalable carrier access and a credible path to 100G-class external connectivity where customer requirements justify it.

Separate from the internal AI compute fabric.
COOLINGLiquid-cooling ready

Liquid-cooling ready: CDU architecture, secondary loop, heat rejection, redundancy and later expansion must be evaluated together.

PHYSICAL SITEDeployable and serviceable

Building or modular space, equipment access, secure perimeter, electrical and cooling areas, with expansion allowance preferred.

DESIGN FOR EXPANSION

Preserve practical pathways for added power, fibre, cooling and modular capacity.

AI IT PILOT3 MWILLUSTRATIVE INITIAL PLANNING
Target AI IT / compute load3.0 MWDefined pilot capacity
Operating facility demand3.6–4.2 MWIllustrative planning range
Initial usable-power screen≈ 4.5 MWBefore detailed design
FIBRE / CONNECTIVITYExternal carrier / WAN readiness

Two physically diverse fibre paths preferred, with multiple scalable carrier services and a path through multiple 100G services—and potentially toward 400G-class connectivity—where the workload requires it.

Separate from the internal AI compute fabric.
COOLINGLiquid-cooling ready

Liquid-cooling ready: multiple CDU or cooling zones, secondary distribution, heat rejection, redundancy and phased capacity growth.

PHYSICAL SITEDeployable and serviceable

Larger electrical and cooling footprint, staging and heavy-equipment access, secure operations, with significant expansion allowance preferred.

DESIGN FOR EXPANSION

Protect the site layout and infrastructure corridors needed for a larger modular phase.

Illustrative initial site-screening targets only. Actual facility power, connectivity, cooling, redundancy and physical requirements depend on compute architecture, workload, customer requirements and site design. No universal PUE or bandwidth-per-MW formula is assumed.

What do IT load, facility load and PUE mean?

IT load is the electrical demand of computing, storage and networking equipment within the defined IT boundary. Facility load also includes cooling, pumps, CDUs, electrical losses and support systems outside that boundary.

Power usage effectiveness (PUE) is total data-centre energy divided by IT equipment energy over the same measurement period and boundary. The 1.2–1.4 operating-demand multiplier shown here is an illustrative AMOR planning assumption—not a guaranteed measured PUE, an industry-wide requirement or a substitute for utility and electrical design review.

For a 1 MW IT pilot, this example gives 1.2–1.4 MW operating facility demand and an approximately 1.5 MW initial usable-power screen. For 3 MW IT, the example gives 3.6–4.2 MW and an approximately 4.5 MW screen. Redundancy, reserve capacity, operating conditions and the actual design must be assessed separately.

Planning references and the limits of the numbers

AWS documents 100 Gbps and 400 Gbps dedicated connection options; NVIDIA distinguishes internal compute traffic from customer uplinks. Those sources support available connectivity classes and architectural separation—not a rule linking WAN bandwidth to megawatts. AMOR’s 100G-class and multi-100G examples are conditional readiness targets, subject to carrier availability and customer requirements.

These are public technical references, not endorsements of AMOR or requirements to use a particular vendor.

Capacity follows a customer and workload strategy.

The same megawatt can support very different commercial outcomes depending on hardware, utilization, network design, service model and customer requirements. These are potential categories—not promised customers.

01Enterprise AI02Private AI clusters03Sovereign or regional compute04Inference workloads05Specialized training06GPU cloud capacity07Research and institutional compute08Dedicated private infrastructure

Design the pilot with future phases in mind.

The pilot should avoid unnecessarily blocking later growth. Expansion remains a separate decision based on additional power, fibre scalability, land, cooling capacity, approvals, customer demand and capital.

Pilot development

Start with the site. Define the first capacity block.

Share the documented power, fibre, site-control and development position. AMOR will determine whether a 1–3 MW pilot warrants further review.

Submit a powered site Review qualification criteria