Multiple rack-scale commissioning load systems installed in a data-centre hall

Amor Group | Mission Critical | Equipment

Commission Before
the Compute Arrives.

Controllable electrical and thermal load systems used to validate high-density AI infrastructure before production servers are introduced.

Match the test load to the infrastructure being proven.

01

Rack level

High-density AI rack emulation

  • Hybrid air + liquid
  • Full liquid
  • Rack-scale electrical and thermal loading
02

Hall / cooling level

High-capacity liquid load systems

  • CDU validation
  • Liquid distribution testing
  • Thermal load simulation
  • Capacity and redundancy testing
03

Facility level

MW-scale commissioning load banks

  • Generator testing
  • UPS / backup-power validation
  • Electrical distribution testing
  • Integrated systems testing

Rack-scale precision. Facility-scale capacity.

Pair of Fullde hybrid air and liquid AI rack emulators

Rack level | Hybrid air + liquid

240 kW Hybrid Rack Emulator

Total load
240 kW
Liquid load
192 kW
Air load
48 kW
Resolution
1 kW

Simulate the electrical and thermal characteristics of a high-density AI rack before the production servers arrive.

View equipment
Rear liquid connections and manifolds on a full-liquid AI rack emulator

Rack level | Full liquid

300 kW Full-Liquid Rack Emulator

Liquid load
300 kW
Architecture
Full liquid
Voltage
380-480 V
Resolution
1 kW

Rack-scale liquid thermal emulation for next-generation high-density AI infrastructure.

View equipment
Multiple liquid-connected load systems deployed in a data-centre hall

Hall and cooling level | Liquid load

300-600 kW Liquid Load Banks

Standard range
300-600 kW
Models
4
Voltage
380-480 V
Resolution
1 kW

Scale controlled thermal load from individual racks to AI halls and cooling zones.

View equipment
Containerized MW-scale load banks deployed at a data-centre facility

Facility level | LV + MV

MW-Scale LV/MV Load Banks

Power range
1-8 MW
Voltage
400 V-10.5 kV
Load types
R / R-L / R-C
Deployment
Container / trailer / skid

Full-facility electrical load testing for mission-critical infrastructure.

View equipment
Technology & Manufacturing Partner: Fullde

More than equipment delivery.

Equipment and field support for L4 functional performance testing, heat-load testing and L5 integrated systems testing under the approved project commissioning plan.

  • Equipment selection and configuration
  • Mobilization and site-readiness coordination
  • Temporary electrical interface coordination
  • Liquid connection coordination
  • Equipment setup and operating support
  • Troubleshooting and data-capture support
  • Coordination with owner, CxA, GC, EC and mechanical teams

Technical discovery

Send us your project requirements.

Tell us the rack architecture, electrical capacity, cooling configuration and commissioning stage. Amor will help define the appropriate equipment configuration.

Request a project review