Facility level | LV + MV

MW-Scale LV/MV Commissioning Load Banks

Full-facility electrical load testing for mission-critical infrastructure.

Containerized MW-scale load banks deployed at a data-centre facility
Power range1-8 MW
Voltage400 V-10.5 kV
Load typesR / R-L / R-C
DeploymentContainer / trailer / skid

Commission the infrastructure before compute goes live.

Containerized and skid-based load banks for generator, UPS, electrical distribution and integrated systems testing. Systems are project-configured from individual MW-scale units through modular multi-bank deployments.

Technical specifications

ModelRated powerNominal voltageLoad typeTypical packaging
LB-10001 MW400 / 480 VResistiveSkid / container
LB-20002 MW400 / 480 V / 6.6 kVResistive / reactive optionalContainer
LB-25002.5 MW400 / 480 V / 6.6 kVResistiveContainer
LB-40004 MW6.6 / 10.5 kVResistive / reactive optionalContainer
LB-80008 MWUp to 10.5 kVProject-configuredMulti-container system
Representative range
1 / 2 / 2.5 / 4 / 8 MW
Nominal voltage range
400 V to 10.5 kV
Load types
Resistive; project-configured inductive or capacitive components where specified
Packaging
Skid, container, trailer or modular multi-container system depending on project
Loading
Step loading for staged commissioning scenarios
Monitoring
Voltage, current, active power and frequency
Project interfaces
Project-specific connectors, cable interfaces and protection arrangements
Technology & Manufacturing Partner: Fullde

Where the equipment fits.

Final test responsibilities and procedures remain governed by the approved project commissioning plan and the CxA.

01Generator load testing and endurance runs
02UPS and battery-system validation
03Switchgear, transformer and feeder verification
04Backup-power sequence testing
05Integrated systems testing
06Black-building and resilience scenarios

Designed around the commissioning task.

01

Facility-Level Load Testing

Rack and liquid thermal emulation validate the IT and cooling side. MW-scale load banks complement them by applying controlled demand to the wider power infrastructure serving the data centre.

02

LV & MV Configurations

Systems can be configured from individual MW-scale units through modular multi-bank deployments, with LV and MV configurations selected against project voltage, power, interface and protection requirements.

03

Generator & UPS Validation

Apply staged and sustained demand for generator acceptance, endurance runs, UPS or battery discharge, transfer sequences and recovery checks under the approved test plan.

04

Integrated Systems Testing

Coordinate load steps with switchgear, transformers, feeders, controls and backup-power sequences to support integrated systems testing and black-building or resilience scenarios.

05

Modular / Containerized Deployment

Skid, container, trailer and multi-container configurations support transport, mobilization and phased site deployment. Final packaging and cable interfaces are project-specific.

06

AMOR Deployment & Field Support

Amor can support configuration, mobilization, site-readiness coordination, temporary electrical interface planning, setup, operating support, troubleshooting and data-capture coordination with the owner, CxA, GC and EC.

More than equipment delivery.

Equipment and field support for L4 functional performance testing, heat-load testing and L5 integrated systems testing under the approved project commissioning plan.

  • Equipment selection and configuration
  • Mobilization and site-readiness coordination
  • Temporary electrical interface coordination
  • Liquid connection coordination
  • Equipment setup and operating support
  • Troubleshooting and data-capture support
  • Coordination with owner, CxA, GC, EC and mechanical teams

Project requirements

Send us your MW requirement

Tell us enough about the power, cooling architecture and commissioning stage to begin the correct equipment review.

Send us your MW requirement
01Project location02Required MW / kW03Rack type and density04Voltage05Air / liquid / hybrid cooling06Test stage07Anticipated test date